Loading…

Primary site · Katavi Region, Tanzania
Copper-led processing with gold as a secondary product, and a plant campus on site — leaching, laboratory, yard, and staged expansion you can read from the air.
Technical frame
Early site observations report copper and gold in structurally controlled quartz veins. DreamCore has not published a resource estimate or reserves, and no independent geological report has been completed. Certified copper and gold assays and an independent technical report are the next proof points.
Mine planning, plant design, and geotechnical controls are one system — not isolated packages. The campus is sequenced for selectivity, recovery, and progressive rehabilitation.
Access, power, water, and logistics corridors are staged to support construction, ramp-up, and future flotation without forcing premature capital intensity.
On the ground

01 / 06
The DreamCore compound set in Tanzania countryside — scale you can see.
Next: recovery pathway, or the diligence sequence partners request.

Site systems

Operating
Five concrete vat leaching tanks along the west edge of the compound.